SCHEDULE 3
FREIGHT CHARGES FOR LINE PIPE ( PLAIN AREA ).
Specification :- Road Freight Charges:-
Dispatch by road may be allowed based on freight charges on per MT per Km _slab basis subjected to following
conditions:-
a)Road freight charges would be paid only if DDO has specifically ordered for dispatch by road in the supply order
subject to (C) below:-
b) In case of Dispatch by road the supplier will make delivery of stores at consignee’s premises. No loading and
unloading charges would be allowed these charges are inclusive in freight charges.
c) Road freight charges shall be paid for distance between railway station nearest to the mill and railway station nearest
to the consignee. However if the railway station
nearest to consignee is more than 50 Kms away from consignee premises, Road freight charges shall be paid for
distance between railway station nearest to the mill and the actual consignee premises. However no freight charges will
be paid for supplies with in the municipal limit of the mill premises, or up to 50 Kms from the mill premises whichever is
higher.
d) Railway station nearest to the mill will be declared in the tender by the tenderer and will be specified in the Rate
Contract. Railway station nearest to the consignee will be specified in the supply order by the DDO. DDO will also specify
the distance for each consignee in the supply order.
e) Road freight charges will be firm during the currency of R/C.
f) Before asking `Dispatch by road for less than wagon load, the DDO may also ensure that the total road transportation
cost does not exceed the transportation charges payable by rail for FULL WAGON LOAD.
SCHEDULE 4
FREIGHT CHARGES FOR LINE PIPE ( HILLY AREA ).
Specification Road Freight Charges:-
Dispatch by road may be allowed based on freight charges on per MT per Km _slab basis subjected to following
conditions:-
a)Road freight charges would be paid only if DDO has specifically ordered for dispatch by road in the supply order
subject to (C) below:-
b) In case of Dispatch by road the supplier will make delivery of stores at consignee’s premises. No loading and
unloading charges would be allowed these charges are inclusive in freight charges.
c) Road freight charges shall be paid for distance between railway station nearest to the mill and railway station nearest
to the consignee. However if the railway station
nearest to consignee is more than 50 Kms away from consignee premises, Road freight charges shall be paid for
distance between railway station nearest to the mill and the actual consignee premises. However no freight charges will
be paid for supplies with in the municipal limit of the mill premises, or up to 50 Kms from the mill premises whichever is
higher.
d) Railway station nearest to the mill will be declared in the tender by the tenderer and will be specified in the Rate
Contract. Railway station nearest to the consignee will be specified in the supply order by the DDO. DDO will also specify
the distance for each consignee in the supply order.
e) Road freight charges will be firm during the currency of R/C.
f) Before asking `Dispatch by road for less than wagon load, the DDO may also ensure that the total road transportation
cost does not exceed the transportation charges payable by rail for FULL WAGON LOAD.
General Technical Requirement for T/Enq.
1. Steel Pipe for Line pipes shall be in random length of 6 meters as per table – 12.
2. Plain End pipe shall be square cut or Bevelled on both ends as per clause 9.12.5 and coating as
per Clause 12.1.2 of IS/ISO : 3183(2007).
3. All Pipes shall be checked for visual examination such as surface conditions, imperfections and
defects . dimensional requirements i.e. Length, O.D., wall thickness, beveling, weight and hydrostatic
test pressure as per IS/ISO 3183:2007.
4. Physical properties covered in IS/ISO 3183 -2007like tensile strength, yield strength and elongation,
flattening etc shall be checked as per random sampling plan of IS 2500 (Part-I) Inspection level-II.