JCO Gas Pipe Limited
Alliance Tubes Company & Consultant is the Oldest Distributor for JCO Gas Pipe Limited. We have a large inventory of MS & GI Pipes available at our various warehouses in Delhi
Buy JCO Gas Pipe Limited at Alliance Tubes Company & Consultants
JCO Gas Pipe Ltd. is a company promoted by D.P Jindal Group and Chokhani Group. The Company has come up as Spiral SAW pipe arm of D.P Jindal Group, pioneers in manufacture of Seamless & ERW pipes in India. The plant is centrally located near Nagpur with state of the art Japanese mill for manufacturing of pipes of highest quality. The project is set up in a total area of approximately 100 acres in Boregaon Industrial Area, district Chhindwara, Madhya Pradesh for the manufacture of Spiral Submerged Arc Welded (HSAW) pipes with installed capacity of 100000 MTPA conforming to IS 3589:2001, IS 5504, API-5L-X70, ASTM.
Saw Pipe
Spiral Saw Pipe
JCO Gas Pipe Ltd. specializes in manufacturing of Spiral SAW Pipes covering a range from 406 mm to 1626 mm diameter with wall thickness ranging from 5mm to 25mm conforming to IS 3589: 2001, IS: 5504, AP-5L, ASTM.
Pipe Process:
The raw material used in manufacture of Spiral SAW is H.R. Coil. It is continuously formed to require the specific diameter of the pipe, spirally welded at high speed and cut to required length. The following operations are carried out when the material is loaded for making of the pipe.
Entry Line :- Here the coils are opened, edge milled to required width and fed to forming stand at uniform speed. This unit also enhances the joining of the tail-end of the out going coil with the leading end of the incoming coil to produce continuous strips. Before initializing new campaign, entry line will be positioned inan angle, called Helical Angle in respect to the normal of forming table center axis.
Forming Stand :- The unit performs as the heart of the mill. Here the strip is formed to required size of the pipe & spirally welded.
Exit Line :- The main purpose of exit line is to give proper support to the pipe during forming, cut the pipe to required length and eject it outside.
The pipe is then visually inspected thoroughly, both in & out side, for probable weld defects such as under cut, porosity. If any defects found, it will be rectified as per the approved QAP (Quality Assurance Plan). After this the pipe will be sent to Beveling (Chamfering & Facing) machine for better quality pipe joints during laying works at site. Then the pipes are hydrostatically tested to ensure that there is no leakage from weld joint or parent material.
The pipe will be inspected at different stages of production to ensure the quality of the product. The inspection process consists of Physical / Visual Inspection, Destructive & Non-Destructive Testing & final inspection before sending for dispatch.
USAGE |
(i) Water |
|
(ii) Oil & Gas |
|
(iii) Structural |
|
(iv) Industrial |
|